Program management
Design package management
Criteria, drawings and markups moved to a record set on schedule.
Each design workstream gets a package kind that fits it: a design set, a purchase package or a session pack. Not every thread needs a drawing set. The kind sets the deliverable and the review path.
Examples of our work
Package kinds for an expansion
Defined which workstreams of a plant expansion needed a design set, a purchase package or only coordination notes, and ran each accordingly.
Design packet transmittal
Assembled design deliverables into transmittals with a cover letter, so each hand-off had one PDF and one date.
Log in