Program management

Design package management

Criteria, drawings and markups moved to a record set on schedule.

Each design workstream gets a package kind that fits it: a design set, a purchase package or a session pack. Not every thread needs a drawing set. The kind sets the deliverable and the review path.

Examples of our work

  1. Package kinds for an expansion

    Defined which workstreams of a plant expansion needed a design set, a purchase package or only coordination notes, and ran each accordingly.

  2. Design packet transmittal

    Assembled design deliverables into transmittals with a cover letter, so each hand-off had one PDF and one date.